Skegness Holiday Park

Recotherm replace poorly performing AHU with CVME 1000

A well-known holiday park in Skegness’ existing swimming pool air handling unit (AHU) had been on site for less than 20 years.  They were being faced with numerous repair bills and high running costs.  Neighbours in nearby holiday homes and even further were also complaining about the noise being made by the existing system. 

Being able to provide a peaceful holiday park environment is a top priority so they sought to replace their existing AHU.

Old Air Handling Unit to replace

They were specified with another air handling unit offering.  However, after conducting thorough research themselves, the client prioritized finding the best product on the market to provide both service, reliability and running costs and chose Recotherm for the project.

Challenges:

The park aimed to have the new unit delivered and operational by Easter, so were not able to make large structural changes in order to accommodate a new AHU.  

Access was limited and only available through double doors and the sizable unit sited high in the building structure on a mezzanine floor.

Old Air Handling Unit to replace

Solution:

We were approached by the holiday park to provide a solution that met their requirements. Our CVME 1000 unit was proposed as it’s known for its efficiency, reliability and commitment to providing the best atmosphere for pool hall users.

Despite the tight deadline Recotherm were able to have the unit delivered to site within a timescale and also in manourverable pieces.  Our “flat pack” build process, ensured the new AHU would fit through the tight access and up to the location on the mezzanine, thus addressing the site constraints.

CVME 1000 Onsite Assembly Flat Pack

The installation of Recotherm’s CVME 1000 provided the holiday park in Skegness with a reliable, cost-effective, and efficient heating and ventilation solution to replace their current AHU.  Recotherm’s track records for engineering air handling units that last 30+ years the park can expect reliable performance for years to come.  Enhancing our customer’s operational efficiency and  satisfaction, instilling confidence in the holiday park.  The neighbours have already reported how much quieter the new offering has improved the overall experience for park visitors and staff.

CVME 1000 Commercial Air Handling Unit
CVME 1000 Commercial Air Handling Unit

Conclusion:

Our successful implementation of the CVME 1000 unit at the Skegness holiday park exemplifies their commitment to delivering high-quality solutions tailored to their clients’ needs. By addressing challenges such as time restraints and site constraints, Recotherm demonstrated our expertise and dedication to customer satisfaction, ultimately providing a solution that exceeded expectations and contributed to the park’s success.